Turnaround & Shutdown Air Monitoring for Refineries & Petrochemical Plants

Turnaround and shutdown air monitoring built for the outage clock — benzene, H₂S, welding fume, hex chrome and silica analyzed in-house at our Houston lab, with reserved capacity and 1-day rush so a compressed turnaround never waits on results. Samples in before 2:00 PM CST logged same day. Kits ship to plants anywhere in the U.S., and accounts are open to plants and turnaround contractors alike.

AIHA-LAP Accredited · LAP-101470 NVLAP 101793-0 · Asbestos Bulk PLM Reserved Turnaround Capacity Nationwide Ship-In
Why AGT

Why Plants & Turnaround Contractors Put Us on the Account

1-Day Rush & Same-Day Log-In

Samples in before 2 PM CST are logged same day; rush analysis clears work fronts without holding the schedule.

In-House Capacity

High volume stays under one roof — no subcontracting, no send-outs, one chain of custody for the whole event, whichever plant it is.

Dedicated Turnaround PM

One coordinator owns kits, priority handling and reporting for the outage — a single point of contact end to end.

Accredited & Defensible

AIHA-LAP accredited analysis, with NVLAP and PJLA accreditation on asbestos — reports that hold up with OSHA, legal counsel and insurers.

Scheduled outage only — not what you need?

This program is built for compressed, high-volume turnaround and shutdown events. For ongoing, day-to-day compliance monitoring at an operating plant, see our Routine Refinery & Plant Compliance program instead.

Turnarounds & Shutdowns

Turnaround & Shutdown Air Monitoring, Handled End to End

Turnaround air monitoring has to move on the shutdown's clock. A turnaround compresses months of maintenance into days, with hundreds of workers across multiple fronts hitting benzene, H₂S, welding fume, hex chrome and silica at once — and every work front waiting on clearance to proceed.

AGT Labs runs your turnaround air monitoring program in-house from our Houston lab. Personal air monitoring and area samples are analyzed on-site — no send-outs — with reserved capacity, a dedicated project manager, and rush turnaround so results never gate the schedule.

Outages happen wherever the plants are, so the program isn't tied to the Gulf Coast. We stage kits ahead of the window at refineries and petrochemical plants anywhere in the United States, and media comes back by overnight courier — a plant in California or Ohio lands on the same rush schedule as one in Baytown.

  • Personal and area benzene / BTEX by NIOSH 1501 / OSHA 1028
  • H₂S and reactive gases by ion chromatography
  • Welding fume, metals and hexavalent chromium for hot work
  • Respirable crystalline silica by X-ray diffraction
  • Asbestos (PLM/PCM) for insulation and gasket disturbance
  • Standing-account program pricing sized to the outage window
Built for Turnaround Scale
1-Day
Rush turnaround; same-day log-in before 2 PM CST
In-House
No subcontracting — one chain of custody for the whole event
50
States served — kits staged at any U.S. plant ahead of the window
Turnaround Hazards

The Exposures a Turnaround Generates

Opening, cleaning and rebuilding process units at speed releases a distinct hazard mix. These are the exposures our turnaround air monitoring is built around.

01

Benzene & BTEX

Released opening lines, vessels and produced-water systems — the defining refinery carcinogen.

Method:NIOSH 1501 / OSHA 1028
02

H₂S & Reactive Gases

Sour-service units and confined-space entry — quantified by ion chromatography.

Method:Ion chromatography
03

Welding Fume & Hex Chrome

Massive hot-work volume on carbon and stainless — metals by ICP-AES, Cr(VI) by OSHA ID-215.

Method:ICP-AES / OSHA ID-215
04

Respirable Silica

Abrasive blasting and refractory tear-out — analyzed by X-ray diffraction.

Method:XRD (NIOSH 7500)
05

Asbestos

Legacy insulation and gasket disturbance — bulk PLM under NVLAP, air PCM under PJLA ISO/IEC 17025.

Method:PLM (NVLAP) / PCM (PJLA)
06

Noise & Heat Stress

High-density equipment and summer outage conditions — dosimetry and WBGT field monitoring.

Method:Dosimetry / WBGT
Analysis Scope

What We Analyze for Turnarounds

Every analyte below is run in-house under accreditation. Tap any card for the full method detail on our service pages.

Benzene & BTEX

NIOSH 1501 / OSHA 1028 for personal and area exposure across units.

View Service →

H₂S & Reactive Gases

Ion chromatography for hydrogen sulfide and acid gases.

View Service →

Welding Fume & Metals

ICP-AES for 30+ elements across hot-work fronts.

View Service →

Hexavalent Chromium

OSHA ID-215 — stainless welding, coatings and blasting.

View Service →

Respirable Silica

XRD for abrasive blasting and refractory work.

View Service →

Asbestos (PLM/PCM)

Insulation and gasket disturbance. NVLAP-accredited for bulk PLM; PJLA ISO/IEC 17025 accredited for both PLM and PCM.

View Service →
IH Lab AccreditationAIHA-LAP · LAP-101470
Asbestos (NVLAP)101793-0 · Bulk PLM
Asbestos (PJLA)137751 · PLM & PCM
Quality SystemISO/IEC 17025:2017
CoverageNationwide Ship-In

Air Monitoring Across the Turnaround

Exposure monitoring needs shift as the outage moves from opening the unit to hot work to reinstatement. We staff and schedule the lab to match.

PhaseDominant ActivityPriority AnalytesLab Support
Pre-outageBaseline & program setupBenzene, H₂S baselineStanding account, kits staged on site, reserved capacity
Shutdown & openingLine breaking, degassing, entryBenzene/BTEX, H₂SRush TAT, same-day log-in
ExecutionWelding, blasting, refractoryWelding fume, hex chrome, silica, asbestosHigh-volume in-house analysis, priority handling
ReinstatementClose-up & start-upBenzene, H₂S, noise/heatClearance-oriented turnaround, portal reporting

Turnaround Analytes & OSHA Exposure Limits

The regulated limits your monitoring program is measured against, and the method our lab runs for each. These are federal standards and apply at every plant in every state.

HazardOSHA LimitLab MethodSample Type
Benzene1 ppm TWA (STEL 5 ppm)NIOSH 1501 / OSHA 1028Charcoal tube, personal
Hydrogen sulfide (H₂S)20 ppm ceiling (ACGIH TLV 1 ppm TWA · 5 ppm STEL)Ion chromatographyTreated filter / bubbler
Hexavalent chromium5 µg/m³ TWA (AL 2.5 µg/m³)OSHA ID-215PVC filter, personal
Respirable crystalline silica50 µg/m³ TWA (AL 25 µg/m³)XRD (NIOSH 7500 / OSHA ID-142)Cyclone + PVC filter
Manganese (welding fume)5 mg/m³ ceiling · ACGIH TLV 0.02 mg/m³ respirable · NIOSH REL 1 mg/m³ TWAICP-AESMCE filter, personal
Asbestos0.1 f/cc TWA · 1.0 f/cc / 30 minPCM (NIOSH 7400) / PLMMCE filter / bulk
Lab Logistics

Lab Turnaround Times & Program Kits

Turnaround air monitoring runs as a program with reserved lab capacity — here are the rush options and what ships to your site.

Turnaround Options & Surcharges
Standard Analysis
5+ Business Days
No Surcharge
4-Day Rush
4 Business Days
+25%
3-Day Rush
3 Business Days
+50%
2-Day Rush
2 Business Days
+75%
1-Day Rush
1 Business Day
+100%
Turnaround programs run on a standing account with reserved capacity. Turnaround is counted from log-in at the lab — samples received before 2:00 PM CST are logged same day, and overnight delivery puts a distant plant on the same schedule as a local one.

Turnaround Program Includes

  • Reserved lab capacity sized to your outage window
  • Pre-labeled sampling media staged at any U.S. plant ahead of the window
  • Calibrated pump loaners for qualifying accounts
  • Dedicated turnaround project manager
  • Priority handling & rush turnaround across work fronts
  • Chain of Custody, pre-filled; results via secure portal
  • Volume & standing-account pricing
Download COC Form (.xls)
Program Setup

How a Turnaround Program Works

1

Scope the Outage

Share the window, sample count and hazards. A lab manager sizes reserved capacity and pricing.

2

Kits & Setup

Pre-labeled kits and loaner pumps ship ahead to any U.S. plant; a dedicated PM is assigned to the account.

3

Sample & Ship

Crews sample across fronts; media logs in same day if received before 2 PM CST.

4

Rush Analysis

In-house analysis with priority handling and rush TAT clears work fronts fast.

5

Report

Results on the secure portal, compared against OSHA limits, through the whole event.

For Contractors

Running the Sampling? We Work With the Contractor, Not Around You

Safety services firms, third-party monitoring providers and turnaround staffing companies run a large share of the sampling on an outage. The lab side has to fit how you bid, mobilize, bill and report — not how the plant does. And if you follow outages across several states, one account covers all of them.

Per-Sample & Volume Tiers

Priced by sample with volume breaks — not bundled into a plant program whose scope you don't control.

Pumps & Media to Your Yard

Calibrated pump loaners and pre-labeled media shipped to your shop or direct to site, anywhere in the U.S. — mobilization isn't gated on equipment.

Separate COC Per End Client

Distinct chain of custody, reporting and invoicing for each client site — all under one account with one login.

Client-Ready Reports

Results formatted for hand-off, with OSHA limit comparison already applied — nothing to reformat before it reaches your client.

Capacity Reserved at Bid Stage

Pencil in reserved capacity against your bid schedule before award. If the job goes elsewhere or the outage slips, it's released at no cost.

One PM Across Every Site

The same project manager whether you're running one unit or crews at three plants in three states inside the same window.

We don't compete for your client. AGT is a lab — the exposure data goes to you, and how it reaches the plant is your call.

Set Up a Contractor Account
AGT Petroleum Testing

Product Testing for the Same Plants

Beyond worker exposure, our sister petroleum lab handles the product side of a refinery — crude, fuels, aromatics and LPG/LNG — under ASTM/ISO 17025.

Crude Oil Testing

Assay and quality parameters for crude streams. View →

Fuels Testing

Gasoline, diesel and jet fuel specification testing. View →

Benzene & Aromatics

Solvent and aromatics product analysis. View →

LPG / LNG Testing

Liquefied gas quality and composition. View →

Lubricants & Oils

In-service and product lubricant analysis. View →

All Petroleum Services

Full ASTM/ISO 17025 product testing scope. View →

Client Support

Turnaround Air Monitoring — Frequently Asked Questions

Can you handle the sample volume and rush turnaround of a refinery turnaround?
Yes. We run turnaround air monitoring entirely in-house at our Houston lab — no subcontracting or send-outs — with rush turnaround down to 1 business day and same-day log-in for samples received before 2:00 PM CST. Turnaround programs are set up on a standing account with reserved capacity and a dedicated project manager so a compressed shutdown schedule never waits on lab results.
What exposures do you monitor during a petrochemical turnaround?
Benzene and BTEX (NIOSH 1501 / OSHA 1028), hydrogen sulfide and reactive gases (ion chromatography), welding fume and metals (ICP-AES), hexavalent chromium (OSHA ID-215), respirable crystalline silica (XRD), asbestos (PLM/PCM), and noise and heat stress — all analyzed in-house under AIHA-LAP accreditation.
How do you set up pricing for a turnaround program?
Turnaround air monitoring is priced as a program, not per sample. Give us the outage window, estimated sample count and hazards in scope, and a lab manager sizes reserved capacity, rush turnaround and volume pricing before the outage begins.
Do you supply sampling kits and pumps for the turnaround?
Yes. We ship pre-labeled sampling kits and sorbent media to the plant or your yard anywhere in the U.S., and offer a calibrated pump loaner program for qualifying accounts, so field crews can sample on schedule across multiple work fronts and ship media back for same-day log-in.
Can you support turnarounds outside Texas and the Gulf Coast?
Yes — plants anywhere in the United States. Refineries and petrochemical plants run outages in California, the Midwest, the Rockies, the Mid-Atlantic and the Pacific Northwest, and the lab work is identical wherever the samples come from because it all happens at our Houston lab. We ship kits to site ahead of the window and receive media by overnight courier, so a distant plant lands on the same rush schedule as a Gulf Coast one. Our AIHA-LAP, NVLAP and PJLA accreditations are recognized nationwide, and the OSHA standards we report against are federal, so exposure analysis is valid wherever your plant is.
How early should we set up the program?
The earlier the better — reserving capacity and staging kits before the outage window ensures rush turnaround is available when work fronts are moving. For plants outside our courier area, earlier setup also lets us stage kits on site well ahead of shutdown. Call (713) 453-6090 to set up a standing account ahead of your next turnaround.
We're a safety services contractor, not the plant — can we hold the account?
Yes. The account sits with whoever is running the sampling — plant, turnaround contractor, staffing firm or third-party monitoring provider. Contractor accounts are priced per sample with volume tiers, and each end client gets its own chain of custody, report and invoice line underneath a single account. If you follow outages across several states, one account and one project manager covers all of them.
Can you reserve lab capacity before we've won the bid?
Yes. Send the outage window and estimated sample count from your bid and we'll hold reserved capacity against it. If the award goes elsewhere or the outage slips, the reservation is released at no cost — we would rather hold the slot than have you chasing lab capacity after mobilization.

Get Pricing for Your Refinery Turnaround Air Monitoring

AIHA-LAP accredited · benzene · H₂S · welding fume · hex chrome · silica · asbestos · 1-day rush · reserved capacity & volume pricing — scoped before your outage window. Plants anywhere in the U.S.; plant or contractor accounts.