K-12 & Higher Education Industrial Hygiene Testing

Accredited asbestos, mold, lead, indoor air quality and Legionella testing for school districts, universities and educational facilities — supporting AHERA asbestos management plans and safe reoccupancy timelines. Analyzed in-house at our Houston lab, with 1-day rush, same-day log-in, and kits shipped anywhere in the U.S.

AIHA-LAP Accredited · LAP-101470 AHERA-Consistent Asbestos Surveys 1-Day Rush · In-House Nationwide Ship-In

Built for AHERA Timelines

Bulk survey and periodic re-inspection PLM analysis, sized around the school calendar and the 3-year AHERA cycle.

In-House, One Lab

Asbestos, mold, lead, IAQ and Legionella all analyzed under one roof with one chain of custody.

1-Day Rush

Same-day log-in before 2 PM CST and rush to 1 business day when a summer renovation window is closing.

IH Lab AccreditationAIHA-LAP · LAP-101470
Quality SystemISO/IEC 17025:2017
CoverageNationwide Ship-In
Education · IH Laboratory

Testing Built Around the School Calendar

Every school district and university carries a standing regulatory obligation most other property types don't: an AHERA asbestos management plan for every pre-1988 building, with mandatory six-month surveillance and a full re-inspection every three years. Layer on top of that classroom IAQ complaints, summer renovation windows, and water systems that sit idle over breaks, and testing on a school campus has a rhythm all its own — one we build our turnaround and account structure around.

We analyze the bulk samples your AHERA-accredited inspector collects, run the mold and IAQ testing behind a classroom complaint, and turn around final clearance results before the summer window closes and students return. See our asbestos testing and mold testing pages for the full method detail.

  • AHERA bulk sample surveys and periodic re-inspection analysis (PLM)
  • Final air clearance after summer abatement projects (NIOSH 7400 PCM)
  • Classroom and portable-building mold and IAQ investigations
  • Pre-1978 lead-based paint and dust-wipe testing for renovation projects
  • Legionella testing for dormitories, athletic facilities and low-use plumbing
  • Standing-account pricing for districts and campuses with recurring volume
Built for the School Calendar
3-Yr
AHERA re-inspection cycle we support with accredited PLM analysis
COC
Signed chain-of-custody documentation on every sample, ready for the district file
1-Day
Rush turnaround when a summer renovation window is closing before the fall term
What We Analyze

Laboratory Testing for School Districts & Universities

Six analyses cover the vast majority of educational facility testing — all run in-house at our Houston lab.

Asbestos Testing

AHERA-consistent bulk sample surveys and periodic surveillance for school asbestos management plans.

View Service →

Asbestos Clearance Testing

Final air clearance after summer abatement projects, before students and staff return.

View Service →

Mold Testing

Classroom, portable building and HVAC mold investigations from IAQ complaints or water intrusion.

View Service →

Indoor Air Quality Testing

CO2, particulate and VOC screening for classroom air quality complaints.

View Service →

Lead Testing

Lead-based paint and dust-wipe testing for pre-1978 school buildings and renovation projects.

View Service →

Legionella Testing

Water testing for dormitories, athletic facilities and buildings with low-use plumbing over school breaks.

View Service →

Testing by Facility Type & Timing

The priority testing shifts with the calendar and the building type. We match the sampling plan to the project.

ScenarioTypical TriggerPriority TestingLab Method
Summer abatement projectsPre-1980s building renovation during breakPre-work survey; post-work clearancePLM · NIOSH 7400 PCM
AHERA 3-year re-inspectionMandatory periodic surveillanceAsbestos management plan updatePLM bulk sampling
Classroom IAQ complaintsStuffy air, odor, health complaintsCO2, particulate, mold, VOC screeningDirect-read · spore trap
Portable building assessmentAging portables, HVAC issuesMold and moisture-related testingSpore trap / tape lift
Dormitory & athletic facility waterExtended break, low water useLegionellaCulture (ISO 11731)
Pre-1978 renovation / demolitionOlder building disturbedLead paint/dust-wipe; asbestos surveyAAS/ICP · PLM

A Note on AHERA Responsibility

AGT Labs analyzes the bulk samples your AHERA-accredited building inspector collects — we do not perform the physical inspection or manage your district's asbestos management plan. That split of responsibilities is exactly how AHERA is structured, and it keeps the analytical result independent of the inspection.

Compliance & Clearance Criteria

The regulatory thresholds and pass/fail criteria we test against for education facility work.

Analyte / ProgramRequirement / CriterionReferenceLab Method
Asbestos management planBulk sampling >1% asbestos = regulated ACM; 3-year re-inspection cycleAHERA (40 CFR 763)PLM (EPA 600/M4-82-020)
Asbestos final air clearance<0.01 f/cc (aggressive clearance)NESHAP / AHERA-consistent practiceNIOSH 7400 PCM
Lead-based paint (pre-1978)Floor 10 µg/ft² · Sill 100 µg/ft² clearanceEPA / HUD clearance levelsAAS / ICP-AES
Mold (classroom / portable)Indoor counts/types consistent with or below outdoor comparisonACAC / IICRC S520 practiceASTM D7391 spore trap microscopy
Legionella (dorm / athletic water)Site-specific action levelsCDC / ASHRAE 188 practiceCulture (ISO 11731)

Compliance criteria vary by state education agency and district policy — confirm the applicable standard for your facility before sampling, and we'll build the plan around it.

Lab Logistics

Turnaround Times & Sample Kits

Summer renovation windows and holiday breaks are short. Rush options and what ships to your campus.

Turnaround Options & Surcharges
Standard Analysis
5+ Business Days
No Surcharge
4-Day Rush
4 Business Days
+25%
3-Day Rush
3 Business Days
+50%
2-Day Rush
2 Business Days
+75%
1-Day Rush
1 Business Day
+100%
Turnaround is counted from log-in at the lab, not from collection — samples received before 2:00 PM CST are logged same day. For a campus outside our courier area, overnight delivery puts you on the same rush schedule as a local client.

Program & Kit Support

  • Pre-labeled sampling media (PLM/PCM cassettes, spore trap cassettes, MCE/PVC filters)
  • Chain of Custody form, pre-filled with your district or campus info
  • Kits ship to any campus in the U.S. with a prepaid return label
  • Courier pickup across the Houston / Gulf Coast area for local clients
  • Standing-account setup for districts and campuses with recurring, multi-building volume
  • Calibrated pump loaner program for qualifying accounts
Can I get a same-day rush before the fall term starts?
Rush turnaround runs from 4 business days down to 1 business day (+100% surcharge). Call (713) 453-6090 to confirm rush availability for your analytes and volume before your summer window closes.
Who We Serve

Who Relies on AGT for Education Facility IH Testing

K-12 School Districts

AHERA management plan surveys and re-inspections, plus classroom IAQ and mold investigations.

Colleges & Universities

Dormitory Legionella testing, campus-wide asbestos surveys and renovation project clearance.

Private & Charter Schools

The same AHERA-consistent surveys and clearance testing, sized for a single-campus operation.

School Facilities & Maintenance Directors

A standing lab relationship for recurring surveillance, IAQ complaints and renovation projects.

Environmental Consultants Serving Schools

Third-party analytical support for AHERA-accredited inspectors and district consultants.

General Contractors on School Renovation Projects

Pre-work surveys and post-work clearance coordinated around the academic calendar.

FAQ

Education Facility Testing — Frequently Asked Questions

What testing do schools and universities need for AHERA compliance?
AHERA (40 CFR 763) requires an asbestos management plan for every K-12 school building built before 1988, based on bulk sample surveys (PLM), plus periodic surveillance every six months and a full re-inspection every three years. We run the accredited PLM analysis behind that plan and the surveillance data your AHERA-accredited inspector needs.
Do you provide asbestos surveys for school management plans?
We analyze the bulk samples your AHERA-accredited inspector collects — PLM per EPA 600/M4-82-020 — for new management plan surveys, periodic re-inspections, and pre-renovation surveys ahead of a specific project. We do not perform the physical building inspection ourselves.
Can you do summer abatement clearance testing on a school schedule?
Yes. Summer break is when most school abatement work happens, and we build rush capacity around that calendar — 1-day rush is available on final air clearance (NIOSH 7400 PCM) so a project can close out and rooms can be ready before the fall term starts.
How fast can we get results during a limited renovation window?
Standard turnaround is 5+ business days with no surcharge. Rush options run from 4-day down to 1-business-day (+100% surcharge), and samples logged in before 2:00 PM CST are logged same day. Call (713) 453-6090 to confirm rush availability before your renovation window closes.
Do you test for mold in classrooms and portable buildings?
Yes. Portable classrooms and older HVAC systems are common sources of classroom IAQ complaints. We run spore trap and tape lift mold analysis, plus broader indoor air quality screening (CO2, particulates, VOCs), to investigate complaints and confirm remediation worked.
Do you serve schools and universities outside Texas?
Yes — school districts and universities anywhere in the United States. Because every sample is analyzed at our Houston lab, a kit from a district in another state is handled identically to one from a Texas campus. We ship pre-labeled sampling kits nationwide with a prepaid return label.

Set Up Education Facility Testing — Request a Quote

AIHA-LAP accredited · AHERA-consistent asbestos surveys · mold, lead & IAQ testing · Legionella testing · 1-day rush · kits shipped nationwide · standing-account pricing.